Smart City Project in Kim No, Hai Boi anh Vinh Ngoc commune
 Owner: Bac Hanoi Smart City Development and Investment JSC., (SUMITOMO-BRG Joint Venture)
 Project type: Infrastructure project 
 Project location: Dong Anh, Hanoi 
 Total of area: 270 Ha
 Project cost: VND 4,050 bill.,
 Period of realization: 2024-2025 
 CDC's Responsibilities: Project feasibility study preparation; technical design; 
construction design and cost estimation for technical infrastructure system 
(05 phases)