Trung Minh A new urban area
 Owner: BOG Group
 Project type: Infrastructure project 
 Project location: Phu Tho province 
 Total of area: 58,87 Ha
 Project cost: VND 590 bill.,
 Period of realization: 2021 
 CDC's Responsibilities: Project feasibility study preparation; construction design
 and cost estimation for technical infrastructure system